In sealing joints of single-component, old or new isulation joints or repairing damaged isulation , add 200 ml of water to this product and mix well to obtain a uniform paste, then close.
The final drying time is 24 hours after use, do not pour water on the relevant surface until the final drying time.
In the case of two-component , new or damaged joints, add the second component to the first component and mix well to obtain a uniform dough, then make the seam.
The final drying time is 24 hours after use, do not pour water on the relevant surface until the final drying time.
If the seam is intact, this solution is only used for antacids, chemical resistance and sealing. In this way, after cleaning and drying the joints completely, put the liquid on the seam in two stages. (Washable after 12 hours.)